Archive news article

Ikona BIP Ikona Portal Pracownika Ikona poczty Facebook Twitter Instagram Youtube Linkedin RSS Ikona szukania PLEN

The microphone in the new borehole is working

A device was dropped down to the H-10 roadway through the borehole, but it did not register any signals besides the sound of water. Rescue workers are constantly toiling to lower the level of the flooded area.

Water is being removed using the current set of pumps powered by compressed air. At the same time, a more efficient, electrically-powered device is being transported underground. This pump will operate according to the rules defined by the head of the rescue operation. The device will be delivered in parts and then assembled underground.

The electrical pump will be installed as a second pump from the water surface in the conditions in which this type of equipment may be used. The rescue workers’ working conditions continue to be extremely difficult.