Rescue workers continue to pump out water from the flooded area in the H-10 roadway. The rim of the flooded area has shifted 19 m. Parts of the structure strengthening the roof at the intersection of the H-10 roadway and the H-2 roadway are now visible.
As soon as such a possibility exists, the rescue workers will immediately attempt to penetrate the section along the roadway.
We will issue a separate release with considerable lead time about any possible press conference.