Archive news article

Ikona BIP Ikona Portal Pracownika Ikona poczty Facebook Twitter Instagram Youtube Linkedin RSS Ikona szukania PLEN

The sixth day of the operation is underway in Zofiówka

During the night from Thursday to Friday the drillers accurately drilled a second borehole from the round-shaped F tunnel at the 900 m level and connected to the H-10 roadway. This borehole has a diameter of 9.5 cm. The rescue workers are now sinking a cable with a transceiver device (Mobile Rescue Telephone) and a food packet.

Rescue workers continue to pump out water from the flooded area in the H-10 roadway. The rim of the flooded area has shifted 19 m. Parts of the structure strengthening the roof at the intersection of the H-10 roadway and the H-2 roadway are now visible.

As soon as such a possibility exists, the rescue workers will immediately attempt to penetrate the section along the roadway.

We will issue a separate release with considerable lead time about any possible press conference.